Solar Roofing

Looking into the right Solar Roof Installation in Westmoreland County Pennsylvania?

Understand what to settle on the roof before the electrical work begins

Phone 412-858-8858 before you commit to a layout

Reading the Roof Before Anything Is Mounted: What Gets Checked First

The surface under an array is hard to reach once the array is in place; cracked shingles, soft decking and failing flashing are easier to fix with the surface open. Older houses with plank decking or thin rafters call for a closer look; the crew documents what it finds with photographs.

Standing on the roof and pressing on the surface reveals soft spots that photographs miss; notes and pictures from the walk become part of the planning file. Walk the house with the roofer and point out any trouble spots you know; patterns of old trouble point to a detail that needs correcting.

A roof that is ready for solar is flat, sound and well flashed; roof and array are partners for the long haul. Solar equipment is built to last for a very long time; a worn roof under new panels is a mismatch that grows more costly with time.

Sunlight Varies by Slope and Season: Shade From Trees and Hills

The direction and tilt of each slope decide how well a solar array can perform; a slope with a few hours of clean sun may beat a bigger slope with shade. Anyone planning Solar Roof Installation should ask how shade, cloud cover and the angle of the roof are being weighed; the plan should explain the assumptions behind any expected output.

The roof in Westmoreland County Pennsylvania is read slope by slope for Solar Roof Installation; dormers and chimneys that look small on the ground cast long shadows.

Hip roofs and roofs with dormers break the surface into smaller sections; clear paths between sections allow for service and cleaning. Trees and hills are part of the plan; the neighbors' trees and buildings count as well as the owner's.

Summer sun is higher and kinder to a roof that wrestles with shade in winter; the sun's path across the sky is steady and predictable, and so is the shade it meets.

Racked Panels or Roofing That Makes Power: What Each One Asks of the Roof

Panel racks are the most common way to carry solar on a pitched roof; a rack system leaves the existing roofing in place and adds a layer above it. Courses are set to lines so the rows stay straight and the water sheds correctly; the roofing details at edges, valleys and penetrations still follow roofing rules.

Panels sit proud of the roofing, while integrated tiles sit flush with it; the look of the roof is part of the value of the house.

Solar roofing products come in several forms; the roofing material underneath decides which products can be used. Careful handling matters because the pieces are heavier and more delicate than shingles; solar tile installation rewards patience and a steady pace.

Penetrations Done Right: Seals, Boots and Brackets

In Solar Roof Installation, the attachment points are among the most important details on the whole roof; ice and snow press against every bracket through the winter. Wood shakes and older asphalt shingles may need extra care around each mount; mixing the wrong hardware with the wrong roofing causes cracks and slow leaks.

Mount spacing follows the layout so the load is spread through the framing; a clean job leaves no loose fasteners or exposed holes.

The crew chooses hardware that suits the roof, whether shingle, slate, tile or metal; the right bracket for a slate roof is not the right bracket for shingles.

Edges and corners of a roof take the highest wind loads of all; the roofer reviews the edge details with the same care as the field. Gutters at the bottom edge receive more concentrated runoff than before; the surface under the array is checked at the same time as the rest of the roof.

Snow Load and Shedding: Why Winter Matters in Design

Snow behaves differently on glass-faced panels than on shingles; entrances and driveways should not sit directly below a slick surface. An ice-and-water barrier is worth having along the eaves and in the valleys; keeping the roof deck cold and even is still the first defense.

Winter sunlight on a low-slope roof warms the panels and starts the melt from underneath; a roof that sheds snow safely is a roof designed for the climate.

Ice dams and solar arrays share a roof; a roofer reading the attic helps the whole system work as intended.

Where the Electrical Work Begins and Ends: A Handoff Between Trades

A solar job has a roofing side and an electrical side; the electrical connection to the utility is a separate step from the roof work. Questions about who is responsible for each item are better asked at the start; the owner can ask for a simple outline of the order of work.

Wire entries get the same care as any other opening in the roof; each trade is responsible for its own work, and both depend on the handoff.

A short joint walk with both trades settles most questions before work begins; the route avoids rafters, vents and spots where water collects.

Work Order Makes or Breaks the Job: Timing the Two Projects

When both projects are needed, the roofing comes first and the solar array follows; a new roof and a new array should both be expected to last for a long time. Sometimes the roof needs work after the array is up; the first inspection of the roof decides how smooth the later steps go.

The right order of work keeps the roof and the array both in good shape; a crew can finish the roofing, then hand the roof over for the array.

Every few seasons the roof, the mounts and the flashing are checked for wear; the owner and the roofer share the job of keeping the system watertight.

The order of roofing and solar work saves or wastes a season; the weather windows in the region are limited, so planning matters.

Maintenance Habits for a Solar Roof: Gutters, Edges and Mounts

Check the gutters each fall, since leaves and seed pods collect fast under overhanging trees; shingles around the array edge deserve a look because wind lifts them first. Anything that needs hands on the roof is left to people with the proper harnesses and gear; ice and snow are left to melt rather than chipped away.

Ready to Talk About Solar and Your Roof: Describe the House

The Roofing Company welcomes questions about timing a reroof around a solar project; phone 412-858-8858 to set up a roof walk. Tell us what you see from the ground, and we will help you sort out the next move; every roof is different, and a short talk beats guessing.

Brooks Blasko

Verified

★★★★★
Great work, kept everything professional.

Estee Wagaman

Verified

★★★★★
They did a quick, and fabulous job on my aunt’s roof.

michael Zawodni

Verified

★★★★★
Put a roof over our deck, very professional, kept jobsite clean everyday, and went above and beyond with quality and craftsmanship. Couldn't recommend this company more!! Best around.

Richard Bacco

Verified

★★★★★
Worked on a project with The Roofing Company and their work was top of the line. They payed extreme attention to detail and went above and beyond to insure the project was completed beyond expectations. Crew is neat, clean, fast, and professional. I would definitely recommend them

Jared George

Verified

★★★★★
They did our roof and our back porch. Awesome Job. Very easy to work with and competitive pricing. Everything still looks brand new!