Professional Solar Tile Installation in Westmoreland County Pennsylvania
The Roofing Company – Approaching a Solar Array as an Envelope Decision First
A solar array is presented nearly universally as a power question — return calculations, production numbers, credits. All of those numbers assumes one thing nobody mentions: namely that the roof beneath the array will serve as long as the system does.
Arrays are rated for a working life of roughly twenty-five to thirty seasons. Mounting panels on a roof with a decade years remaining guarantees an expensive future event: taking down the whole system, replacing the roof, and reinstalling it.
The Roofing Company takes on Solar Tile Installation for homeowners around Westmoreland County Pennsylvania, starting with that question the array salesperson didn't put to you.
Contact 412-858-8858 to schedule a visit.
Getting the Order That Saves Money
- Assess the roof before anything. Current age, the deck state, the ventilation, and whether the framing carries the panel load.
- Replace first when the covering is under about ten years of the end. The expense of doing that before mounting is considerably less than doing the same work beneath panels on top.
- Set the system with the mounts sealed to standard — and this is roofing craft, whoever does the installation.
The Points at Which Solar Cause Roof Failures
- Standoff penetrations. Any standoff is an opening through the assembly reaching the structure. Sealed to standard that is entirely fine. Caulked with caulk and nothing else it is a failure on a delay.
- Who owns the roofing going forward. Once an outside company fixes into the assembly, responsibility get murky. Get this on paper in advance.
- Debris below the array. An array produces a covered space that traps material and traps water on the shingles.
- Access for future work. A system planned with no consideration to valleys and roof openings makes every later intervention considerably more expensive.
Solar Tile Roofing — When It Works
Solar roofing place the solar surface inside the roofing as such instead of mounting panels above one. The appeal is aesthetic, and that appeal is a real one on properties where a rack-mounted array would look out of place.
The straight other side: the tile approach costs substantially more money for each kilowatt, and given that the generating element and the weatherproofing become one and the same component, a failure in one is a fault in the other as well. We'll put both considerations on the table.
The Costs Hardly Anyone Puts on the Proposal
A panel proposal covers the panels. A number of envelope costs sitting entirely outside that document, and those items don't go away for going unstated:
- A reroof beneath an existing system. Detaching and resetting panels carries genuine money beyond the roofing work, and it stays completely sidestepped by ordering the two properly.
- Load evaluation. Where the roof structure turns out to be undersized for the additional dead load.
- Attic work. A system changes the thermal profile of the roof plane under the panels.
- Detachment for any subsequent roofing intervention. A single leak under an array runs a great deal higher to get to than the very same leak located on clear covering.
None of those is an argument opposing solar. Those items make the case for resolving the roof timing ahead of anything gets ordered.
Our 10-Year Workmanship Warranty
Qualifying roofing jobs from The Roofing Company include a ten-year term of labor warranty. If a system will be part of the project, we put down specifically whose penetrations this company installed and whose we did not, because coverage that leaves this unclear is effectively worth almost nothing the day a claim comes up.
Rooftop Solar in Pennsylvania
Production here is less than what you get in the southwest, and the payback nevertheless holds up on a great many of roofs with current electricity rates and incentives.
The factor that is different in this climate is snow load and ice. Snow stays on panels for longer than on a clear roof, and panels alters how water leaves the plane — and that worsens ice buildup at the roof edge when the perimeter protection happens to be marginal to begin with.
Common Questions That Are Worth Putting First
Should the roof get done first? When the covering falls within roughly a decade of its end, almost certainly. The money of carrying out it afterward comes to more than doing the same work first by a considerable amount.
Which party owns a leak beneath an array? The party that contractor created the penetration, and that is entirely why it should be set out on paper prior to anything gets fixed.
Do panels void a roofing warranty? The answer depends entirely on who fixed into it and on what conditions. Settle that in advance — the question becomes considerably harder to answer after water is a stain on a ceiling.
Reach 412-858-8858 ahead of committing to an array agreement, so the assembly question gets answered at the outset, at your house in Westmoreland County Pennsylvania.